The electrical installation of Colombo Dockyard PLC is over 0 years old and has undergone many in-site changes and additions. The main problem identified was the unavailability of necessary single line and layout drawings.
This is a survey project carried out to finalize the electrical distribution within the Colombo dockyard.
A complete electrical drawing was generated with the data collected within a time period of one month followed by information regarding the pump house machinery.
Other group Members:
H.M.R.A. Herath
Comments